Present: Mark Storey (Co-Chair), Chris Baker (Co-Chair), Hans Buwalda, John Carnegie, Ray Deacon, Roger Fairclough, David Fletcher, Stuart Frazer, Ray Deacon, Phillip Millichamp, George Riddell, Michael Rynne, Doug Watson.
Suzi Kerr (Convenor of Cluster B of the CCLF).
Officials: Dave Brash, Tim Denne, Mark Dean, Robin Brasell, Megan Taylor & Jan Catley (meeting secretary).
Apologies: Carmen Blackler, James Flexman, Craig Palmer.
Notes of the previous meeting on 6 May 2008 were accepted as a fair and correct record.
Mark Dean (MED) spoke to paper SEIP 23, an update on data issues. Matters highlighted were:
Hans Buwalda spoke to SEIP 24, reporting on the combined eligibility and allocation sub-group’s last meeting. Discussion focussed primarily on the revised allocation methodologies (SEIP/25).
It was highlighted that the UK’s approach to allocation for Phase II of the EU ETS, including provision of new entrants and move towards benchmarking, may provide some useful insights. After the meeting the following link was circulated to members: http://www.defra.gov.uk/environment/climatechange/trading/eu/operators/phase-2.htm
Summing up, the Co-Chair noted that the meeting broadly accepted the 5 variants presented in SEIP/25 and that he would like the next meeting to consider a sub-set of decisions. It was suggested that next steps include:
John Carnegie reported on progress of the methodologies group (SEIP 26, SEIP 27, & SEIP 28) noting material was provided as a work-in-progress as the data is still incomplete. He noted the focus of the team’s work on: process definitions, obvious points of measurement, & emission factors, as well as the inevitable trade-off between simplicity (low compliance costs) and accuracy. A further meeting was planned for 2-3 weeks time upon Carmen’s return.
The following points were raised in the discussion that followed:
Actions:
It was agreed to establish a new sub-group to work on price pass-through issues in the electricity market. A useful starting point is to review earlier work relating to both electricity factors (tCO2e/GWh) and emission charge pass through.
Robin Brassel to liaise with MED to pull together an overview of earlier work.
Dave Brash reported back on the recent Cluster B and CCLF meetings. Suzi Kerr, in her role as co-ordinator of Cluster B of the CCLF, outlined the work the cluster has been doing on allocation issues and the leakage case studies in particular.
A general update was provided by officials and industry attendees.
The last CCLF focused on:
Suzi Kerr noted the technical capability of SEIP TAG in working on detailed allocation issues. She commented that she will consider the respective roles of the TAG and CCLF going forward. Suzi also agreed that she would continue to participate in future meetings of the TAG and its allocation sub group to the extent she can, in order to help ensure the respective groups complement each other.
The timing of the Select Committee process was outlined. Report back is due on 16th June. The Bill then goes through the Committee stages and through second and third readings (estimated to be in July).
An outline of the interim report was circulated for discussion. It was agreed that the outline was OK. There was a brief discussion over whether to continue working on the TAG interim report at this stage or wait until the Select Committee has reported back. After some discussion it was agreed to carry on as planned and subsequently revise if necessary.
There was a brief discussion about reporting standards that might be applied to cover ETS reporting. There are international ISO standards that are extensive but do not specify ‘how to do it’. It was suggested that there may be a tension between the Governments preference to ‘keep it simple’ and the EU’s approach based on ISO standards.
Next meeting date (to focus on the Interim Report) is Wednesday 25 June at The Treasury
Next monthly meeting on Tuesday 1 July at The Treasury.